T & E
Premium Property Services & Domestic Electrical Installers
 
 
The Team
Our History
 
 
The work that we do
The type of work we carry out
 
 
Contact Us
Contact details either by phone or email
 
 
Locations
The areas that we cover
 
 
Our Friends
Our favourite supply companies
 
 
The High Wycombe kitchen with a truly delightful Italian twist
Another amazing kitchen transformation
 
 
Tiling and more tiling, finished off with some more tiling
The challange of the century 80m2 of glue, have fun.
 
 
Caught just in time
The Holyport kitchen
 
 
Light and Spacious
A new kitchen in Maidenhead
 
 
The Princess Risborough Bathroom
A good solution to a tricky problem
 
 
In Farnham Royal
The En-suite and the Bathroom
 
 
By the River Thames in Maidenhead
A new layout upstairs and two new bathrooms
 
 
The Loudwater Kitchen
The Loudwater Kitchen
 
 
One of our own kitchens
As and when I get 5 minutes !!
 
 
The Ealing Bathroom
The Ealing Bathroom
 
 
The Marlow Kitchen
The refit Kitchen Marlow
 
 
The Shower Room
The Stoke Manderville Project
 
 
The Egham Project
The En-suite shower room
 
 
Before and After
Photos of how it was and how it now is
 
 
Bathrooms & Cloakrooms
Some previous bathrooms
 
 
Kitchens
From fitting new doors to complete install
 
 
Hallways
Some pictures of a completely re-decorated hallway
 
 
Fencing & Gates
 
 
Comments
What some of our customers have said
 
 

The Marlow Kitchen

We have been asked to re-fit this tired kitchen.
We will be removing the partition wall to the left, replacing the ceiling and installing downlighters, tiling the floor, re-wiring, re-plastering where needed, laying new floor in the dining area, and re-coving the ceiling. We estimate that we will be here for about 3 weeks.

Thank you Joy and Ian for your confidence in us





With the wall now removed, all the cabinets removed, this room has really opened up. We have removed the old flooring in the kitchen and we will be replacing the carpet in the dining area with a wooden floor.


We have also removed the old ceiling to enable us to wire in the new set of downlighters. We have also stripped the walls of all blown plaster. We will be repairing this with new plaster to enhance the overall finish.


With all the plastering done, we can now think about the layout and tile the floor




It is amazing what can be done in just 3 weeks. I think this kitchen looks fantastic. The colour of the cabinets, the colour of the worktops, even the bold colour on the wall all complimented with stainless steel fittings it just works together really well,



With the wall now removed and a breakfast bar fitted, it has really turned this whole room into the social hub of the house. With the flat panel tv giving it a modern look.

Simple things make a big difference, the single layer of polished black tiles as a splash back, the wine rack that was made to fill a gap between the wall and the cabinet all come together to give this kitchen an air of quality


With the American style of fridge and 5 tall larder units, this kitchen now has plenty of storage. we have even made a concealed cupboard at the end for the ironing board.


With 16 new downlighters replacing 4 old pendant light fittings, I Iove the lighting in this room, This is also complimented by under cabinet lighting and the lights on the extractor fan.


Using the original oven and by adding a stainless steel splash back and extractor really works well with the colour scheme. Clean and simple but also very practical


A big thank you to Joy, Ian and family, Thank you all for the way in which you have looked after us over the last 3 weeks. Joy, thanks for allowing us to eat all the chocolate biscuits from your tin and anything else we could find ( thanking you on the behalf of Dave really ) and Ian thanks for all of your humourous remarks that you gave without of which we would have not have made it through the day and thanks for all of the running around that you did for us collecting parts etc. Tom, thanks again for your patience for all the times that you came home from school and there was no electricity and do not think for one moment that Dave and I have forgotten about our Yums Yums, we will be expecting replacements! thanks to Natalie ( Joys 20 yr old lovely daughter ) for putting up with all the noise that we made during the day while you where still trying to sleep!! and well, just for being there and giving us the incentive to get there on time!!!

Thanks again Dave & Ray

Text-only version of this page  |  Edit this page  |  Manage website  |  Website design: 2-minute-website.com